Jump to content

Backup strategy


Recommended Posts

I'm trying to duplicate what I was doing in Backup Exec. I have 2, 20 tape libraries that have 2 tape drives each. I had the first cartridge (10 tapes) in each library designated as 'backup set 1' and had all my backup jobs for the week pointing to this backup set. Veritas would utilize all 4 tape drives at once each day as to minimize the backup window as much as possible. At the end of the week, I would remove the first cartridge in each library to send off site and point the backup jobs to the second cartridge in each library.

 

How can I get Retrospect to utilize all 4 tape drives at once from approximately 10 backup jobs from just the first cartridge (10 tapes each) in each library?

Link to comment
Share on other sites

  • 2 weeks later...

Archived

This topic is now archived and is closed to further replies.

×
×
  • Create New...