atravesde Posted September 19, 2007 Report Share Posted September 19, 2007 if i pushed the red boton, to stop all operation i can run a manual backup to do inmediate or urgent backup, by example doing backup to exchange or sql database. if i stop all operation i can use all the bandwidth and all my network, diskstorage device, retrospect cpu and memory at its maximium capacity, all dedicated to an specific operation. i need schedule all of these operation, to automate , cause by now i am doing this manually. doing an automatic enabler of the red buton to re enable all the operation and continue with all my normal schedule backups maybe next version, is going to has this option thank you Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.