Jump to content

Workgroup starts but doesn't backup


robulack

Recommended Posts

On a scheduled backup, the following happens:

 

 

 

Recycle backup using Daily Backup at 8/29/2002 11:00 PM

 

To backup set Backup Set A...

 

 

 

8/29/2002 11:00:24 PM: Connected to BILLH

 

8/29/2002 11:00:23 PM: Recycle backup: The backup set was reset

 

 

 

- 8/29/2002 11:00:23 PM: Copying Bill10may99 (C:) on BILLH

 

8/30/2002 7:42:29 AM: Execution stopped by operator

 

Remaining: 11472 files, 1.2 GB

 

Completed: 0 files, zero KB

 

Performance: 0.0 MB/minute

 

Duration: 08:42:10 (08:42:05 idle/loading/preparing)

 

 

 

8/30/2002 7:42:29 AM: Execution stopped by operator

 

Total duration: 08:42:10 (08:42:05 idle/loading/preparing)

 

Quit at 8/30/2002 9:04 AM

 

 

 

If I do an immediate backup, everything works OK.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...