On a scheduled backup, the following happens:
Recycle backup using Daily Backup at 8/29/2002 11:00 PM
To backup set Backup Set A...
8/29/2002 11:00:24 PM: Connected to BILLH
8/29/2002 11:00:23 PM: Recycle backup: The backup set was reset
- 8/29/2002 11:00:23 PM: Copying Bill10may99 (C:) on BILLH
8/30/2002 7:42:29 AM: Execution stopped by operator
Remaining: 11472 files, 1.2 GB
Completed: 0 files, zero KB
Performance: 0.0 MB/minute
Duration: 08:42:10 (08:42:05 idle/loading/preparing)
8/30/2002 7:42:29 AM: Execution stopped by operator
Total duration: 08:42:10 (08:42:05 idle/loading/preparing)
Quit at 8/30/2002 9:04 AM
If I do an immediate backup, everything works OK.